#7 Bathroom Reno: The Prep Work Continues!

Bathroom Reno: Prep Work!

The behind the scenes work continues. Things are happening. Just remember that good things take time (and skill)! Insulation was added in areas in addition to the spray foam that was done on demo day. #sealupthosecracks #donotletthecrittersin Continue reading “#7 Bathroom Reno: The Prep Work Continues!” →

#5 Bathroom Reno: The Devil Is In the Details…

I like when people leave notes so that it’s clear! No room for misinterpretation!

To me, every bit of building is so important. If you don’t have a solid foundation and proper use of materials in the beginning (even though you don’t see them) that can lead to problems in the future (i.e. water, or tile that cracks, etc.) Continue reading “#5 Bathroom Reno: The Devil Is In the Details…” →

#4 Bathroom Reno: And so it begins… Lights Out.

Bathroom Reno: Subfloor installed

The demo portion is done, so now there is a clean slate. Nothing horrible was found except for a section of pipe that was behind the shower from the controls to the shower head was taken outside and placed softly on grass – the pipe fell apart. Continue reading “#4 Bathroom Reno: And so it begins… Lights Out.” →